Documents & Diagrams Diagrams

The following documents/diagrams will be presented and discussed during round table sessions.

Organization Description Diagrams
Ermanno P @ ICTP Site Profile Old profile from DSI | New profile Fac Med - ADIE

https://maps.google.com/?ll=14.67585,-17.454014&spn=0.023207,0.028067&t=h&z=15

UBNT AirFiber? MIB (for measuring link characteristics:

http://dl.ubnt.com/airfiber-fw-internal/AF.v1.5-Beta1/UBNT-MIB.txt

http://www.spectrumwiki.com/wiki/

Question: what's the max EIRP allowed in Senegal for 24 GHz ?

http://www.cplus.org/rmw/rmonline.html

http://www.wunderground.com/personal-weather-station/dashboard?ID=IDAKARDA2#history

http://www.digitalairwireless.com/files/airFiber-1Gbps-24Ghz_1332965263.pdf

Workplan

  • verify status of licensing (may we turn the equipment on ?)
  • site survey
    • physical access to both locations
      • UCAD: access to roof of building, get LOS to ADIE
      • ADIE: access to roof of building, get ADIE to LOS
  • cable path
    • grounding of equipment + copper for grounding (run cable)
    • lightning arrestors
  • cable safety (attachment, type of cable (outdoor, STP/UV protected)
  • mounting of equipment (pipe/tower/mast) ?
  • IP considerations, integration into campus
  • monitoring considerations (see MIB) for signal/GPS/throughput
    • rain data for Dakar (June to October is rain season)
      • already something
    • correlate signal / rain / time etc.
Last modified 5 years ago Last modified on Jul 29, 2014, 2:42:11 PM

Attachments (3)

Download all attachments as: .zip